| Brea Olinda High School Expansion |
| CHPS Designed Project in Progress |
 |
|
School Information
|
|
|
School District:
|
Brea Olinda Unified School District |
| Completed: |
October 2007 |
| Students: |
|
| Size: |
31,650 Square Feet |
| Architecture Firm: |
LPA, Inc.
|
| CHPS Scorecard (2002 Edition) |
| Site: |
8
|
| Water: |
0 |
| Energy: |
8 |
| Materials: |
1 |
| IEQ: |
13 |
| District Resolutions: |
1 |
| TOTAL: |
31 |
| - Mimimum of 28 points required of possible 81. |
| High Performance Features |
| Project is a 2 Story New Building. Brea Olinda High School Expansion Building will be a new 32,000sf, 2 story building containing science laboratories, classrooms, consumer education classrooms, and a staff workroom. The overall energy performance of the building exceeded Title-24 by 30%. The new building is oriented to take advantage of natural daylighting. Translucent glazing units with a honeycomb core, clerestory windows and skylights are utilized to draw daylight deeper into the space. A “cool” roof, wall and roof insulation, and Low-E glazing keep heat gain out of the building. All classrooms have daylight sensors and occupancy sensor lighting controls as some of the energy saving features. |
| Back to CHPS Schools Page. |
|