| Cesar E. Chavez Education center |
| CHPS Demonstration School |
|
| School Information |

|
|
School District:
|
Oakland Unified School District |
| Completed: |
Fall 2003
|
| Students: |
600 |
| Size: |
95,000 square feet |
| Architecture Firm: |
VBN Architects
|
| CHPS Scorecard (2002 Edition) |
|
| Site: |
11 |
| Water: |
1 |
| Energy: |
11 |
| Materials: |
2 |
| IEQ: |
10 |
| District Resolutions: |
3 |
| TOTAL: |
38 |
| - Mimimum of 28 points required of possible 81. |
| High Performance Features |
| Energy efficiency goal to exceed Title 24 (2001) by 20%; natural ventilation; maximum use of daylighting planned for classrooms; recycled content materials and cool roofs. High efficiency heating ventilation with maximum use of "free cooling due to mild Oakland climate." Low VOC, steel frame, fly ash concrete, high recycled material content, non-toxic materials, construction debris control/recycling. |
| Back to CHPS Schools Page. |