| Conley-Caraballo High School |
| CHPS Completed School Project |
|
School Information
|

|
|
School District:
|
New Haven Unified School District |
| Completed: |
Fall 2006 |
| Students: |
500 |
| Size: |
27,500 square feet |
| Architecture Firm: |
ATI Architects & Engineers
|
| CHPS Scorecard (2002 Edition) |
|
| Site: |
10 |
| Water: |
1 |
| Energy: |
17 |
| Materials: |
0 |
| IEQ: |
11 |
| District Resolutions: |
3 |
| TOTAL: |
42 |
| - Mimimum of 28 points required of possible 81. |
| High Performance Features |
 |
The school was designed with a pv solar energy system that can produce at least 85% of its energy consumption. In addition, the Gymnasium is a designated joint-use area for community groups.
|