Heroes Elementary School
CHPS Demonstration School

School Information


School District:

Santa Ana Unified School District
Completed:

Fall 2006

Students: -
Size: 46,400 square feet
Architecture Firm: NTD Stichler
CHPS Scorecard (2002 Edition)
Site: -
Water: -
Energy: -
Materials: -
IEQ: -
District Resolutions: -
TOTAL: 44
- Mimimum of 28 points required of possible 81.
High Performance Features
This project is sponsored by the California Integrated Waste Management Board (CIWMB). Heroes design specifications include several products made from waste tires including tire-derived resilient flooring, playground surfaces, rubberized asphalt concrete, and parking stops. Other products include tile made from recycled windshield glass, formaldehyde-free acoustical ceiling tiles made from newsprint, toilet partitions made from recycled plastic beverage containers, thermal insulation made from recycled glass beverage containers, 50% postconsumer recycled content paint, and low-emitting recycled content carpet. Heroes also hopes to take advantage of the waste diversion credits by 75% (2 points under the Material Credit 1). A case study will also be developed as a resource for designers and students. Click here for more information about this project.
Back to CHPS Schools Page.

> Home > CHPS Overview > CHPS SchoolsTraining and Events
Publications and Resources > CHPS Membership